SUREbridge
  • Home
  • About
    • About surebridge
    • Strengthening with bonded pre-stressed FRP composite laminates
    • Fiber reinforced polymer decks
    • Task Plan
    • ERA-NET Plus Infravation 2014 Call
  • Case Study
  • News
  • Partners
  • Publications
  • Software Tool
  • Contact

News

SUREbridge in Composite World – Refurbishing bridges at half the time

28 April 2022

On July 5, 2018, a poster was presented at the 10th European Solid

6 July 2018

On 23rd of May, we held a workshop at Chalmers University of Technology

24 May 2018

SUREBridge features in Ingegneri.info. Read more about the article here.

7 January 2018

SUREBridge features in CompositesWorld Magazine. Read more about the article here.

30 November 2017

Press news about the SUREBridge project:

29 November 2017

On November 6th, 2017, the SUREBridge project was illustrated

6 November 2017

On October 25th, the ERA-NET Plus Infravation Annual Event

25 October 2017

On September 22nd, a public seminar

22 September 2017

On 1st of September, we had a workshop at Chalmers University of Technology

1 September 2017

  • 1
  • 2

FiberCore Europe B.V.

Oostdijk 25
3077 CP  Rotterdam
The Netherlands

+31 10 303 6250
info@fibercore-europe.com

KvK/CoC | 24313140
BTW/VAT | NL 809450586 B01
IBAN | NL09 RABO 0128 4589 33
BIC | RABONL2U
EORI | NL809450586

Website: Feka